Showing posts with label building regulations. Show all posts
Showing posts with label building regulations. Show all posts

Tuesday 18 August 2015

Construction, Design and Management Regulations 2015 - Practical Implications for Conveyancers

Conveyancers should be alert to the Construction, Design and Management Regulations 2015 (became law on 6th April of 2015) when considering recent alterations to both freehold and leasehold property.

If your client owns, uses or manages a building and undertake maintenance or minor building work associated with the business premises, your client has a legal obligation to ensure that all work is carried out safely without damaging anyone’s health. The law covers the all aspects of the building project from start to finish such as how it is planned, organised, managed, project time-scales and phases, the contractor, the designer, welfare of the workers and others on site and health and safety record keeping.

It’s a piece of legislation that uses good design and planning to reduce the number of accidents on site. The latest update means that, for the first time, regulations will apply to construction work commissioned by home-owners. Of the 43 fatalities on construction sites last year, three-quarters were on smaller sites, so the change is being implemented to recognise that the risk is not only on larger sites.

If regulations are not adhered to, construction work may have to be stopped, financial charges may be incurred if the HSE has to spend time resolving the issue. For serious breaches your client could be prosecuted.

From a conveyancing perspective the sale of property could be affected if there is any renovation or other work carried out by a builder who does not comply with the rules.

Under the new rules all builders, whatever their size, working in the domestic sector will have to create a construction phase safety plan for all building projects and all domestic projects will have to meet the same basic standards for the provision of welfare facilities as commercial projects.
For the domestic residential market this means that any construction projects finishing after the 6th April need to have a ‘handover pack’ including ‘built drawings or specifications of components that have been installed.

The responsibility of the home-owner to be clear on who is responsible for site health and safety, and chase the relevant documents at the end of the project.

Clients should be aware that their exposure to claims in negligence has potentially been raised as a result of these Regulations.  In many cases breach of statutory duty is no longer a cause of action itself (Enterprise and Regulatory Reform Act s69), however statutory duties may still influence the existence of a duty (or the reasonableness of behaviour) in negligence claims. The imposition of a number of positive duties via these Regulations may result in a higher expectation of ‘reasonableness’ in the common law context and may therefore lead to personal injury claims against domestic clients that would not have arisen in the past

Practical Implications

If acting for a seller then you should be alert to building works which have commenced but are in still in progress or which have finished after 6th April 2015 and to ask you client to provide evidence of compliance with these regulations.   You should be ready to receive and respond to a request for a health and safety pack.

If acting for a purchaser then an enquiry along these lines about any recent works should be raised especially if purchasing a new build property.  Equally those who manage a leasehold property should also be asked for these details if recent works have been carried out to a block of flats, for example.  Perhaps the LE1 form should be amended to include such question.

In the case of a multi-let building where the landlord retains repairing obligations in respect of parts of the building it may be appropriate to check that the landlord has been given the health and safety file on completion of the tenant’s project.   Landlord’s when giving consent for works under a lease should make a condition of a license to require the tenant to produce the health and safety pack.

Sorry but yet another regulatory obligation to add to an ever growing list for the underpaid and over worked conveyancer!

MJP Conveyancing are solicitors who provide legal advice and services to clients based in England and Wales and who can be contacted on 01603877000 or via email at davidpett@m-j-p.co.uk

Monday 27 July 2015

Building Regulations: Cottingham v Attey Bower & Jones Re-Visited

Time and time again I am asked by buyer’s solicitors for indemnity insurance to address the absence of building regulation approval for home improvements such as an extension.  In the majority of these cases there is no justification for the cost of establishing an indemnity policy and though I do my best to argue my case I am frequently met with misconceived responses. The truth is that many conveyancers do not have the time to consider the law and the easy route is to ask for insurance. 

I am sure I am not alone when I say I did not become a lawyer to ignore the law and to follow blindly practices which have through laziness become  the norm.  I recognise conveyancing is very much rooted in practice but there is applicable case law and statutory provision which ought at times to be considered. 

So when asked for indemnity insurance to address the absence of building regulation approval and or a completion certificate a competent conveyancer should look at the facts and apply the law accordingly.  The offer of indemnity insurance look be looked upon as a last resort option. 


The first question to consider is when was the work carried out.  If it was completed within the last 12 months then my view would be to insist on the seller seeking retrospective  building regulation approval/completion certificate.   The Law Society's Conveyancing Handbook, makes it clear that only where work had been done in the preceding 12 months should the purchaser's solicitor enquire whether building regulations consent was obtained and complied with. Don’t even consider indemnity insurance in these cases.  This is a sticking plaster and in the words of Taylor Swift ‘Band-aids don't fix bullet holes’!  Most lenders would also require  retrospective consent remembering of course that the lack of approval and or a completion certificate should be reported. 

If it was carried out over 12 months then the seller should be asked whether it was work undertaken under concealment which would not of course be the case if planning permission was sought.  The seller should also be asked if building regulation approval has ever been refused.  It should also be ascertained with reference to your clients survey whether the work is likely to give rise to serious threat to life and safety. If for example the work was undertaken 20 years ago and the works are viewed by the surveyor as sound it would be difficult to see how a local authority could even contemplate injunctive action under section 36(6) of the Buildings Act.  

Keep in mind when asked for that costly and often unnecessary indemnity policy that it is there to protect the client from enforcement action under s36(6) not to provide protection if the works subsequently prove defective.   So one has to weigh up the risk of enforcement and in doing this it well worth keeping in mind that in 1998 an enforcement concordat was signed and adopted by almost all local government organisations with an enforcement function. This requires building control departments when carrying out enforcement to take a consistent approach and treat matters with proportionality, effectively making it unthinkable that injunction proceedings would now be utilised in relation to a minor item of domestic building work that took place years before.

Birmingham building control unit, the largest in the country, only had to resort to court action in five cases in 2003.

In cases where I argue indemnity insurance is not necessary or indeed required those competent conveyancers acting for the buyer often trot out the argument that following  the decision in Cottingham v Attey Bower & Jones [2000] PNLR 557 there is no longer any time limit on enforcement and therefore indemnity insurance should be sought in every instance where there is no building regulation approval.

This is an interesting authority and one which is not really based on the risk of enforcement but has more to do with the defectiveness of works carried out.  In Cottingham the buyer's claim related to the cost of rectification of the defective works and not loss arising out of enforcement action. In fact there was no enforcement action taken or indeed threatened.  The claim would have been brought against the buyer’s surveyor and the seller had it not been for doubt as to their financial standing. 

Its is also based on the the failure of the buyer’s solicitor to make adequate inquiry about building regulation approval.   This would suggest that if a buyer asks about building approval and discovers this has not been sought then if in the judgment of the buyer’s solicitor there is no or little risk of enforcement ( relying for instance on the survey) it could be argued with justification that the buyer’s solicitor in not  pursuing the issue has acted in the best interests of his or her client.  The only proviso to this is that the buyer client should be warned there is a risk of enforcement albeit a minimal one. Providing this advice is given it would be difficult to see a Cottingham situation arising particular in the light of the 1998 Concordat. 

In short there is a need to look at each individual case on its own merits and to be bold enough to make a judgement call based on both case law, statute and the practice  direction of the enforcement agencies. 

MJP Conveyancing are solicitors who provide legal advice and services to clients based in England and Wales and who can be contacted on 01603877000 or via email at davidpett@m-j-p.co.uk

Saturday 6 June 2015

Are you allowing your clients to be ripped off by indemnity insurers?

The cost of moving could in some transactions be reduced if more lawyers took time to consider planning and building regulation requirements more closely. 

The knee jerk reaction by some to jump to the tune of indemnity indemnity insurers and take out unnecessary insurance is inexcusable. Often clients are asked to pay several hundred pounds for insurance which if the lawyer took more time to consider the case would not be required. 

In this article I try and set out my thoughts on what lawyers should be thinking and doing when considering the planning and building regulations requirements of changes and additions to a property being purchased or sold by a client. 

If you know about an alteration or addition to a property that has happened in the last four years or a change in use within the past 10 years the yes insist on seeing the planning.  It's important to check the conditions if any to ensure there has been full compliance. If consent doesn't exist then indemnity insurance can be considered.  Check with the lender if the client is purchasing with a mortgage since the lender may not depending on the circumstances be willing to lend. 

However if changes have taken outside these periods ( 4 years where there is planning consent without conditions and 10 when there are conditions or change of use ) is it really necessary to push for sight of the planning consent. If you know the work was not concealed and the local search result shows no breach of condition is it really necessary to call for and par for indemnity insurance? 

The Planning Act 1990 states that lack of consent for work completed over 4 years ago is unenforceable and there is immunity for breach of condition or change of use after 10 years. You should if acting for the buyer ask the seller to confirm that the work was not concealed as in the case of Welwyn Hatfield Council v. SSCLG [2010] EWCA Civ 26 & R. (Fidler) v. SSCLG - [2011] EWCA Civ 1159

Why waste money on indemnity insurance which is wholly unnecessary and only serves to put easy money into the pockets of indemnity insurers. 

Turning now to building regulation approval. If the works were pre 1985 there is no need to worry if no approval or completion certificate exists. Local  Authorities were not compelled to keep records until the advent of the Building Act 1984. So dont be tempted to take out insurance. 

The Buildings Act 1984 was the first time that the Authority was required to keep records of Buildings Regulations. 

If the works were carried out post 1985 and a Building Regulations Completion Certificate is revealed by your search there is no need to seek a copy unless you are unsure about what it covers. 


If work was carried out in the past 12 months and there is no reference to it in the local search report then report to lender if purchasing with a mortgage and  check with Valuer/Surveyor as to structural integrity of the alteration and the issues that arise if the client were to undertake additional works.  In this situation always seek subject to the lender’s approval indemnity insurance because  the Local Authority has rights to serve a Stop or Enforcement notice within 12 months under the Buildings Act 1984. Consider whether a retrospective certificate should be sought. 

If work undertaken more than 12 months ago and there is no evidence of a completion certificate then  advise the client of lack of  availability of a Completion Certificate and to check with Valuer/Surveyor as to structural integrity of the alteration and the issues that arise if they wish to undertake additional works.    

If the surveyor has concerns then if there is a lender involved advise straight away and consider seeking a retrospective certificate or indemnity insurance. Advise the client on the exposure to enforcement action. These situations are the exception rather than the rule. 

If there are no concerns its unlikely the client would be exposed to enforcement action because  there would be nothing in the public interest to support an application for an injunction under s.36(6) of the Buildings Act 1984 to seek demolition of the works unless the works has been concealed and or present a health and safety issue to the public.  In my opinion don't waste money on indemnity insurance. 

So what about installation certificates?

The same applies as above and to help I have put together a draft reply to deal with those countless requests for charitable donations to the indemnity insurers coffers. 

This is the reply I suggest when a seller is asked for indemnity insurance for the absence of a FENSA or other installation certificate where these are shown to exist in the buyers local authority search:


It is clear from the result of the local authority search that the installation was undertaken according to requisite building regulations and therefore there is no scope to argue your client will be exposed to enforcement action.  Indemnity insurance is therefore unnecessary and will not be offered.  If you disagree then we would ask you to cite legal authority to support your argument that indemnity cover is necessary and indeed essential in terms of protecting your client’s interests. 


The reply of a seller when asked for indemnity insurance for the absence of a FENSA or other installation certificate where this is not disclosed in the result of the local authority search would I suggest be as follows: 


The time for enforcement action ended some time ago and unless the Local Authority can show that the installation presents a danger to the public then there is no scope to argue your client will be exposed to enforcement action. Indemnity insurance is therefore unnecessary and will not be offered.  If you disagree then we would ask you to cite legal authority to support your argument that indemnity cover is necessary and indeed essential in terms of protecting your client’s interests. 

As mentioned above if there is no evidence of building regulation compliance your client is better off paying for a competent contractor to inspect and report on the installation than wasting money on indemnity insurance. The risk of enforcement action is very low compared with the cost of replacement if the work was carried out haphazardly. 

Do keep in mind every transaction is different and the above general observations and guidance may not always apply. If you are a homebuyer or seller you should always take advice from an experienced conveyancer. The above is offered as guidance rather than advice that can be relied upon. 


Morgan Jones and Pett are solicitors who provide legal advice and services to clients based in England and Wales and who can be contacted on 01603877000 or via email at davidpett@m-j-p.co.uk

Thursday 2 April 2015

Don't put your client's conservatory at risk

The very first thing to establish is whether what you are building actually is a conservatory. 



There is no definition in the Regulations of exactly what constitutes a conservatory. This can make it hard to judge whether what is built will be be regarded by your Local Authority as a conservatory or an extension. 




This is crucial as as extension usually requires planning consent and is subject to greater building regulation requirements, while a conservatory usually does not require planning consent and the building regulation requirements are much more relaxed.

Conveyancers are good at asking questions about the planning and building regulation consent history behind conservatories forming part of properties being purchased, but less attentive to analysing and applying the answers received.  

Below are some general questions ( with guidance on how to treat the answers) which may help. They are not definitive and you should always when considering these matters have reference to the Planning Portal. 

Was planning permission required?

Is there a wall within the existing external dwelling which exists between the dwelling and the newly constructed conservatory? If there is not then the general rule is that the work will be viewed as an extension and planning permission would be required.

Was building regulation approval required?

Is it built at ground level?   If not and is more than a single storey in height then building regulation approval would be required.

Does it have a floor area of less than 30 square meters i.e. the same as a parking space for a car?  If it is more, then building regulation would be required.

Does the glazing comply with Part N of the building regulations?  If not then building re building regulation would be required.

Does the electrical work have its own ring main, or is extended from an existing room classed as a special location, such as a kitchen? If so it must comply with Part P of the Building Regulations, which deals with electrical safety. If not then building regulation approval would be required.

Does it have an independent heating system with separate temperature and on/off controls? If not then building regulations would be required.


Is there a new opening within the existing dwelling which creates access into the new conservatory if so then this will require building regulation approval? 

It is important to note that even if building regulation approval is not required for the conservatory construction the glazing and the electrical work would still need separate consents.

Keep also in mind that if you are acting for a purchaser and have concerns about consents it is important to check the detailed requirements which you can find on the Planning Portal: http://www.planningportal.gov.uk/permission/commonprojects/conservatories/

Care must be taken because if a problem subsequently emerges then enforcement action can be taken by the Local Authority, which could result in the demolition of the extension.

MJP conveyancing are solicitors who provide legal advice and services to clients based in England and Wales and who can be contacted on 01603877000 or via email at davidpett@m-j-p.co.uk

Friday 10 August 2012

Is October 2012 the right time to introduce new building regulations?

Though there is little written on the subject it seems that by October of this year we will all be paying more for home extensions and improvements.   

It is expected that those undertaking home extensions, loft conversions or integral garage conversions will be required, and not given any choice, to undertake ‘consequential’ energy efficiency improvements in other parts of their property.

Upon implementation this may mean having to find the money to implement measures such as fitting a new boiler or solid wall insulation, up to a limit of, or even beyond, a value of 10% of the cost of the extension or conversion works.

If you are thinking of only replacing a boiler or (some or all) windows this likely to trigger  a mandatory  requirement to install one, some or all of loft insulation, cavity wall insulation, hot water cylinder insulation and draught proofing.

The impact of these requirements could be significant when you consider with information supplied by the DCGL that every year there are around 200,000 domestic extensions, loft conversions and integral garage conversions, one million homes have windows replaced and 1.4 million boilers are replaced.

If you are thinking of making changes now is to the time or you could find making and paying for changes beyond the scope of their planned building works.

The aim is admirable - implementing cost effective changes will help reduce carbon emissions and save on energy bills.  However at a time when the economy is running on empty is the timing of this right?   Are we ready for more red tape, extra costs and will not in fact put off people from carrying out home extensions and how will this impact on the building and other related industries.  Time will only tell.

Morgan Jones and Pett are solicitors who provide legal advice and services to clients based in England and Wales and who can be contacted on 01603877000 or via email at davidpett@m-j-p.co.uk

Wednesday 11 January 2012

Building Regulations and moving home

Do I have supply evidence of Building Regulation Approval in respect of works carried out to my property when I look to sell my property?

If you have the approval then of course supply it – it will help to ensure your sale moves quickly.

If you have carried out works and approval was required and sought and you no longer have a certificate then call the issuing council and ask for a duplicate.

If you have carried out work, and the work required building regulation approval, but this was not sought then you need to consider with your solicitor when the work was carried out and what to do in response to your buyer’s request for sight of the approval.

The following may help.

Check that work carried out actually required building regulation approval as not all work attracts the requirement.

If the building work was carried out before November 1985 it would not require building regulation approval. There is no need therefore to supply it or offer indemnity insurance.

If work was carried out after November 1985 you can apply to the council for a regularisation certificate. A fee will be payable.  Remember however that once you apply the option of offering indemnity insurance for the defect will be removed.

Depending on when the work was carried out you may also be asked for a completion certificate.

The Building Regulations 2000 provide for the issue, by local authorities, of completion certificates where work has been carried out and completed under the building regulations, and the local authority are satisfied, after taking all reasonable steps, that the relevant requirements of the building regulations have been complied with.

If the work was carried out within the last two years (time limits vary but in the main proceedings must be brought within 2 years of the completion of the offending works) before the sale you will most certainly be asked for the approval, completion certificate or a regularisation certificate if these are not available.  This is because the time for taking enforcement action exists during this period.

However by reason of a decision in the case Cottingham v Attey Bower & Jones it seems an enforcing council may be able to enforce a breach outside this time limit. Due to this when selling solicitors for the buyers normally seek confirmation of compliance of building regulations since the property was built.

The problem is that most council offices don’t keep records of building regulations more than four or five years back. They will often conduct searches of their archived records for £150 or so but what if they don’t turn up an approval? The chance to get an indemnity policy for lack of building regulations has passed so your only option is to pay for the council to come out and inspect the works and issue a regularisation certificate.

Is it always necessary to offer indemnity or a regularisation certificate? 

It is most unlikely that a council will be concerned about a wall being knocked through some 20 years ago particularly given budgetary constraints.  It would only take action if it considered the works were dangerous.  The fact is if they were dangerous this would be revealed in the buyer’s survey.  So if not revealed as dangerous I question whether the risk of injunction proceedings is as high as some buyer’s solicitors would have us believe.

The use of indemnity policy by the seller to address this defect if you are the buyer is one which should be avoided as the policy offered will not provide protection if the work was carried out and structural alterations arise by reason of it.  For this reason a full survey should always be commissioned.
If commissioned and you are the buyer then providing all is well the need for chasing the seller for building regulation approval on works carried out in the deep past must be questionable.

A lack of building regulations indemnity policy could be useful in the case of recent works where a survey reveals no defects and the buyer is in a hurry.
Remember any window or door installation since the 1st April 2002 (contract for work was entered into after this date) requires a certificate issued by the Local Authority Building Control of FENSA.  

As for certain building work involving electrical work or electrical work to existing installations all such work requires Building Regulation Consent if carried out after 1st January 2005.

A Building Regulation Compliance Certificate is also required for the installation of central heating systems after 1st April 2005. Since the 1st April 2009 the scheme changed from CORGI to Gas Safety Register.

Before accepting advice to take our indemnity insurance please read this article by the same author : Overuse of Indemnity Insurance  


.Morgan Jones and Pett are solicitors who provide legal advice and services to clients based in England and Wales and who can be contacted on 01603877000 or via email at davidpett@m-j-p.co.uk

Featured post

If it's not broken don't fix it